2 | Upgrading from SmartKDS 4.6 to SmartKDS 4.7
.
This article covers the steps required to upgrade from SmartKDS 4.6 to the latest SmartKDS 4.7
Key Differences
- SmartKDS 4.7 is now a standalone product and is no longer contained in the Bepoz program directory
- SmartKDS 4.7 is available from the Bepoz UPD Program (C:\Bepoz\Programs\BepozUPD.exe)
- Scheduled jobs are no longer required to send and receive information between Bepoz and KDS
- KDS Devices are no longer required to be setup in Backoffice
Prerequisites
- Minimum of Bepoz v4.7.2.7 + is required
Upgrade Process
- Bepoz version must be upgraded to at least Bepoz 4.7.2.7
- Existing Scheduled Jobs for Send & Bump to KDS will be removed automatically with the upgrade to Bepoz v4.7.2.7
- Existing KDS Devices in Venue, Stores & Tills will be removed automatically with the upgrade to Bepoz v4.7.2.7
- KDS 4.7 should be downloaded using the Bepoz UPD program within the Bepoz Program directory and choosing the relevant option
- The user should then follow the setup procedures listed
here to install and configure SmartKDS 4.7
Quicklinks & Additional Resources
-
SmartKDS Installation -
KDSLink Setup -
SmartKDS Server Configuration -
SmartKDS Workstation Settings -
SmartKDS Printer Setup -
SmartKDS Usage -
SmartKDS Workstation -
KDS Metrics Report