Materials Control

1 | Materials Control Product Scheduled Job

This article explains how to set up the Scheduled Job called "Materials Control Products" within BackOffice.

This article explains how to set up the Scheduled Job called "Materials Control Products" within BackOffice.

Prerequisites

  • Minimum Bepoz version of 4.6 and onwards
  • To setup the scheduled job, the applicable Operator Privileges will need to be enabled
    • Operator Maintenance 'General' Tab
      • System Setup: "Maintain Scheduled Jobs" Flag

Materials Control Products Scheduled Job

  • Login to Backoffice and go to System Setup
  • Go to Scheduled Jobs and click on Add Job
  • Details are as follows:
    • Job Name: As per desire
    • Job Type: External DLL
    • DLL Name: Jobexport.Dll
    • ClassName: Materials Control Products
    • Schedules: Set as per desire
    • Job Options:
      • Export Filename: The filename for the exported data file
      • Export Code 1: This will limit the exported Products to just the ones with a matching Export Field
      • Export Delimiter: Export Delimiter can be chosen from TAB, Hash, Percent, Comma, SemiColon, Caret and Pipe
      • Product Group: The Product Group to Export
      • Standard PriceNumber: This is the Pricenumber used for Standard Prices