QSR

5 | QSR Product Preparation Times

This article covers the Product preparation time feature which was added in Backoffice to support QSR integration. Product Preparation Time is an estimated time configured by the operator to calculate the cooking/ prep time.

This article covers the Product preparation time feature which was added in Backoffice to support QSR integration.

Product Preparation Time is an estimated time configured by the operator to calculate the cooking/ prep time.

Prerequisites

  • To access QSR features, the applicable Operator Privileges will need to be enabled 
    • Operator Maintenance 'General' Tab
      • System Setup: "Access Venue, Stores & Tills" Flag
      • System Setup: "Maintain Venue, Stores & Tills" Flag
      • System Setup: "Maintain Till Function Maps" Flag 
    • Operator Maintenance 'Maintenance' Tab
      • Products: "View Products" Flag 
      • Products: "Edit Products" Flag


Product Preparation Times

  • QSR can support up to four (4) Preparation/Cook Times and one (1) Plate Time & Bepoz supports all of these times
  • After KDSLink has been configured, a new tab will appear on the  Product Maintenance  window called "Preparation Times" where these times can be input for all Products
    • These different times can be configured in QSR to change the behavior of when the items appear on the KDS
  • If a Time entered is greater than zero (0), the respective time will be sent through KDSLink to QSR
  • These times will determine when Products will be Printed/Displayed on the KDS
  • Enter the desired Preparation & Plate Time(s) for each Product as needed, including Condiment Products