SmartKDS Setup 4.7.2.7 +

2 | Upgrading from SmartKDS 4.6 to SmartKDS 4.7

.

This article covers the steps required to upgrade from SmartKDS 4.6 to the latest SmartKDS 4.7

Key Differences

  • SmartKDS 4.7 is now a standalone product and is no longer contained in the Bepoz program directory
  • SmartKDS 4.7 is available from the Bepoz UPD Program (C:\Bepoz\Programs\BepozUPD.exe)
  • Scheduled jobs are no longer required to send and receive information between Bepoz and KDS
  • KDS Devices are no longer required to be setup in Backoffice

Prerequisites

  • Minimum of Bepoz v4.7.2.7 + is required

Upgrade Process

  1. Bepoz version must be upgraded to at least Bepoz 4.7.2.7
  2. Existing Scheduled Jobs for Send & Bump to KDS will be removed automatically with the upgrade to Bepoz v4.7.2.7
  3. Existing KDS Devices in Venue, Stores & Tills will be removed automatically with the upgrade to Bepoz v4.7.2.7
  4. KDS 4.7 should be downloaded using the Bepoz UPD program within the Bepoz Program directory and choosing the relevant option 
  5. The user should then follow the setup procedures listed  here  to install and configure SmartKDS 4.7



Quicklinks & Additional Resources

  • SmartKDS Installation
  • KDSLink Setup
  • SmartKDS Server Configuration
  • SmartKDS Workstation Settings
  • SmartKDS Printer Setup
  • SmartKDS Usage
  • SmartKDS Workstation
  • KDS Metrics Report